HITT Contracting Headquarters | |||||||||||||||
2900 Fairview Park Falls Church, VA Charlie Haack
|
|||||||||||||||
|
Technical Assignments Technical Report One - ASHRAE 62.1-2007 & 90.1-2007 Technical Report One is an analysis of HITT Contracting Headquarters building ventilation, envelope and energy efficiency requirements utilizing ASHRAE 62.1-2007 and 90.1-2007. Tech One Executive Summary PDF Technical Report Two - Building and Plant Energy Analysis Technical Report Two is an energy and economic analysis of HITT Contracting Headquarters utilizing a building energy model created in Trane Trace 700. Tech Two Executive Summary PDF Technical Report Three - Mechanical Systems Existing Conditions Evaluation Technical Report Three is an analysis the mechanical systems of HITT Contracting Headquarters as they were designed in the bidding documents. Tech Three Executive Summary PDF
|
||||||||||||||
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Charlie Haack. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design. |
This page was last updated on 11/21/2008, by Charlie Haack and is hosted by the AE Department ©2008