Technical Assignments

Technical Report One - ASHRAE 62.1-2007 & 90.1-2007

Technical Report One is an analysis of HITT Contracting Headquarters building ventilation, envelope and energy efficiency requirements utilizing ASHRAE 62.1-2007 and 90.1-2007.

Tech One Full Report PDF

Tech One Executive Summary PDF

Technical Report Two - Building and Plant Energy Analysis

Technical Report Two is an energy and economic analysis of HITT Contracting Headquarters utilizing a building energy model created in Trane Trace 700.

Tech Two Full Report PDF

Tech Two Executive Summary PDF

Technical Report Three - Mechanical Systems Existing Conditions Evaluation

Technical Report Three is an analysis the mechanical systems of HITT Contracting Headquarters as they were designed in the bidding documents.

Tech Three Full Report PDF

Tech Three Executive Summary PDF

 


 
         
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Charlie Haack. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

This page was last updated on 11/21/2008, by Charlie Haack and is hosted by the AE Department ©2008