Advanced Individual Training

A.I.T. Barracks

Natalie Bockhorst

Construction Management

Fort Eustis, VA

User Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Natalie Bockhorst. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

AE

This page was last updated on 12/11/2011 by Natalie Bockhorst and is hosted by the AE department ©2011

Rounded Rectangle: Tech 
Reports

Technical Assignment One

Technical assignment one will outline key features with my building, how it was constructed and the scope of work. This report includes an executive summary, project schedule summary, building systems summary, project cost evaluation, existing conditions, site layout planning, local conditions, client information, project delivery system, and a staffing plan.

 

Technical Assignment Two   

Technical assignment two will analyze the key features of the project that affect project execution. This report includes an executive summary, detailed project schedule, detailed structural systems estimate, general conditions estimate, LEED evaluation, and building information modeling use evaluation.

 

Technical Assignment Three

Technical assignment three will identify areas of the project that are good candidates for research, alternative methods, value engineering, and schedule compression.