Thesis Progress Log

Brendon J. Burley
Structural Option
Dr. Thomas Boothby
Medical Office Building
Malvern, PA

Quick Links

Information Flow and Follow Up on Previous Issues

Thesis Schedule

Thesis Completed April 11, 2005

Assigned Work

Assignment Due Date Completed Comments
Thesis Initiation Checklist Aug. 31 Aug. 31  
Map W Drive Sept. 7 Sept. 7  
CPEP Initiated & Operational Sept. 17 Sept. 16  
Learning Styles Questionaire Sept. 10 Sept. 10  
Discussion Board - Initial Question      
Building Statistics 1 Sept. 8 Sept. 8 Revised and posted Sept. 16
Building Statistics 2 Nov. 3 Nov. 3  
Resume for Career Fair Sept. 22 Sept. 21  
Bio Sketch Sept. 22 Sept. 21  
Abstract (Color & Content) Sept. 24 Sept. 24 Paper Copy Only
Abstract Final - Posted   Oct. 19  
Abstract Group Board Oct. 19 Oct. 18 Possible misprint. Please refer to online copy.
Technical Report 1 Oct. 6 Oct. 6 Errors in wind and snow load calculations.
Technical Report 2 Oct. 27 Oct. 27 Used wrong safety factor in shear design.
Technical Report 3 Nov. 15 Nov. 15 Error in design load for spot checks.
Breadth Option Summary Proposal      
Preliminary / Draft Proposal      
Proposal Presentation / Consultation Dec. 1 Nov. 23  
Final Written Proposal Dec. 10 Dec. 10  
Final Proposal Approved by Faculty      

Faculty Consultation Log

Date Advisor Type Purpose/Summary
Nov. 12 Dr. Boothby Structural Discussed the lateral support system.
Nov. 23 Dr. Boothby Structural Discussed thesis proposal.
       
       

Outside Consultation Log

Date Advisor Type Purpose/Summary
       
       
       
       

Return to the top of this page.