Office Building - G | Eastern USA
Dominic Coassolo | Construction Management
|
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Christopher Ankeny. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design. |
This Page was last updated on April 27, 2011 by Dominic Coassolo and is hosted by the AE Department © 2010 |
FINAL REPORT
The Senior Thesis Final Report consists of research that was performed throughout the spring semester of the Architectural Engineering-Construction Management program. The report shows the results of the proposed analysis topics that were discussed in the Thesis Proposal.
Executive summary final report [CLICK TO VIEW PDF] [CLICK TO VIEW PDF]
|