Thesis Progress Log

Kristen Shehab

Mechanical

Faculty Consultant – Not Assigned

Data Center

Delaware

 

 

 

 

 

 

 

 

 

Research/ New Design

Topic

Proposed Date

Completed

Comments

Find definite size of electric load

 

1.10.05 – 1.24.05

 

1.24.05

 

Size absorption chillers

 

 

 

 

Find amount of steam needed

 

 

 

Final Report Outline

1.31.05

1.30.05

 

Size turbine generator.

 

1.25.05 – 2.14.05

 

2.14.05

 

Size cooling tower

 

 

 

 

Find amount of excess heat production from turbine generator.

 

 

 

 

Find good balance between heat and electrical load

 

 

 

 

Find dimensions of absorption chillers

 

2.15.05 – 2.28.05

 

2.28.05

 

Place new equipment in designated areas

 

 

 

 

Find cost of new system

 

3.1.05 – 3.14.05

 

3.14.05

 

Compare cost of old and new to see savings

 

 

 

 

Justify amount of money which could be put toward

 

 

 

 

Finish up all loose ends

 

3.15.05 – 4.12.05

 

4.12.05

 

Complete thesis

 

4.05.05

4.05.05

 

Create presentation

 

4.12.05

4.12.05

 


Return to Top of Progress Log