Welcome to Greg Kemerer's AE Senior Thesis e-Portfolio
This proposal was updated after a consultation with Dr. Riley.
Several small changes were made. Most notably, an analysis concerning the
efficacy of radiant ceiling tiles in the middle school was removed.
Research Topic: Obstacles to building green schools.
Tilt-up Wall System: Constructability and cost/schedule savings of using
a tilt-up wall system in combination with a Nitterhouse Masonry Products,
Inc. precast brick facade system.
Metal Stud Walls: Constructability and cost savings associated with replacing
CMU walls with lightweight metal stud walls.
Updated Thesis Proposal
User Note:
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP,
please be aware that the information contained herewith is considered a work-in-progress for this thesis project.
Modifications and changes related to the original building designs and construction methodologies for this
senior thesis project are solely the interpretation of $!!STUDENT!!$. Changes and discrepancies in no way
imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements,
and methodologies have been incorporated into this thesis project; therefore, investigation results may
vary from the original design.