catherine neiderer

pasadena elementary school

construction management

pasadena, md

 

 
     
*This website is best viewed in Internet Explorer    

date announcement
08/27/07 first day of classes
09/07/07 building statistics part 1 completed and posted to website
09/21/07 bio sketch completed and posted to website
10/05/07 technical assignment #1 complete and posted to website
10/08/07 abstract completed and posted to website
10/15/07 building statistics part 2 complete and posted to website
11/02/07 technical assignment #2 complete
11/28/07 technical assignment #2 posted to website
12/03/07 technical assignment #3 completed and posted to website
12/14/07 final proposal completed and posted to website
01/30/08 final proposal revisions completed and posted to website
04/09/08 final report completed and posted to website
04/29/08 website finalized and thesis is complete
 
     
 

Senior Thesis | The Pennsylvania State University| Architectural Engineering | AE Lab | Contact Me

 

This Page was last updated on April 29, 2008 by Cathy Neiderer and is hosted by the AE Department ©2007

 

NOTE:   While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Catherine Neiderer. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.