November 2005
Land is cleared around the original St. Elizabeth Boardman Campus Emergency and Diagnostic Center building to prepare for construction of the new Inpatient Facility.

May 2006
The cranes are on site and have begun the initial stages of erecting steel, the proposed building has begun to take shape.

August 2006
The frame of the new building becomes evident as the steel work continues and grows ever closer to toping out.

October 2006
With the steel framing in place the exterior envelope of the building is ready to be constructed.

March 2007
The building nears completion as the brick facade gets finished, the windows are almost all in place, and the north elevation prepares for the aluminum panel curtain wall system.
|