STRUCTURAL OPTION

HOWARD COUNTY GENERAL HOSPITAL

COLUMBIA, MD

 
  
 
 
 
 
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Christopher Ankeny. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.


 
 
 
Date
Announcement
4/22/08
Resources and Reflection Posted on CPEP
4/15/08
Presented Final Presentation to AE Faculty
4/7/08
Final Report Posted to CPEP
4/4/08
Final Report Completed and Printed
1/16/08
Revised Proposal and Breadth Summaries Posted on CPEP
12/14/07
Proposal Posted on CPEP
12/12/07
Proposal Completed
12/3/07
Technical Assignment 3 Posted on CPEP
12/1/07
10/29/07
Technical Assignment 2 Posted on CPEP
10/25/07
10/15/07
Building Statistics Part II Posted on CPEP
10/3/07
10/3/07
9/28/07
Abstract Completed
9/17/07
Bio and Resume Posted on CPEP
9/14/17
Building Statistics Part II Completed
9/10/07
Building Statistics Part I Posted on CPEP
8/31/07
Building Statistics Part I Completed
8/27/07
Owner Permission Form Signed

 
 
                 