|
Michael Hopple
Structural
North Mountain Integrated Medical Services Office Building
Phoenix, Arizona |
|
|
|
|
|
|
|
|
Welcome to Michael Hopple's AE Senior Thesis E-Portfolio
This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio. |
|
Date: |
Announcement: |
May 1, 2008 |
Posted Reflection |
May 1, 2008 |
Posted Research and Resources |
May 1, 2008 |
Posted Final Presentation |
April 9, 2008 |
Posted Final Report |
January 17, 2008 |
Posted Revised Proposal |
December 18, 2007 |
Posted Proposal |
December 3, 2007 |
Posted Tech Assignment 3 |
November 15, 2007 |
Construction Photos Click HERE |
October 29, 2007 |
Posted Tech Assignment 2 |
October 29, 2007 |
Crane Collapse, Click HERE for info |
October 22, 2007 |
Erection of precast begins |
October 20, 2007 |
Posted Building Statistics Part 2 |
October 8, 2007 |
Posted Abstract |
October 5, 2007 |
Posted Tech Assignment 1 |
September 21, 2007 |
Posted Student Bio |
September 19, 2007 |
Posted Resume to MIke Hopple Bio |
September 14, 2007 |
Posted Building Statistics Part 1 |
August 31, 2007 |
Created CPEP Webpage |
August 30, 2007 |
Recieved Owner Permission |
August 27, 2007 |
Fall Semester Classes Begin |
|
User Note:
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Kate Feato. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.
|
|