SENIOR THESIS E-STUDIO

 

RECENT UPDATES
 
9.4.08
9.5.08
9.30.08
10.8.08
10.13.08
10.28.08
11.22.08
12.13.08
1.16.09
1ST MILESTONE MET
1.26.09
QUESTION POSTED TO BOARD
1.27.09
MET WITH DR. LEPAGE
1.28.09
MET WITH DR. LEPAGE
2.9.09
2ND MILESTONE MET
2.12.09
3RD MILESTONE MET
2.23.09
MET WITH DR. LEPAGE
3.5.09
4th MILESTONE MET
3.16.09
4.07.09
4.29.09
4.29.09
4.29.09
4.29.09

 

 

THANKS TO MY SPONSORS

STRUCTURA - ROCKVILLE, MD.

THE ALTER GROUP - SKOKIE, IL.

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Christopher Ankeny. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

 

This page was last updated on 4/29/09 by Stephen Lumpp and is hosted by the AE Department ©2008