architectural engineering: construction |
Anthony Jurjevic |
Home | Resume and Bio | Building Stats | Abstract | Tech Assignments | Research | Proposal | Presentation | Final Proposal | Reflection |
Home |
Resume and Bio |
Building Statistics |
Thesis Abstract |
Tech Assignments |
Thesis Research |
Thesis Proposal |
Presentation |
Final Report |
Reflection |
Technical Assignments |
The following reports present a technical summary of the Office Building Renovation project. Within these assignments, an in depth discussion of the renovation project will be discussed through the exploration of the major building systems, cost analysis, construction schedule, project team organization, and existing site conditions. |
OFFICE RENOVATION BUILDING |
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Anthony Jurjevic. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design. |
This page was last updated on 12/10/2010 This pages is hosted by the Department of Architectural Engineering© 2010/2011 |
Tech 1: Submitted 10/04/2010 Click Thumbnail |
Tech 2: Submitted 10/27/2010 Click Thumbnail
|
Proposal: Submitted 12/10/2010 Click Thumbnail
|
Tech 3: Submitted 11/29/2010 Click Thumbnail
|