SALK HALL LABORATORY
Located at the University of Pittsburgh Main Campus
Christopher Kelly
Architectural Engineering
Mechanical Option |
This page was last updated on May 2nd, 2011, by Christopher Kelly and is hosted by the Department of Architectural Engineering at the Pennsylvania State University. |
Monday, May 02, 2011 |
While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Christopher Kelly. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, an methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design. |
WELCOME TO CHRISTOPHER KELLY’S SENIOR THESIS E-STUDIO |
ANNOUNCEMENTS |
|
Completed CPEP Site |
Monday, May 2nd, 2011 |
Monday, May 2nd, 2011 |
|
Thursday, April 7th, 2011 |
|
Friday, January 14th, 2011 |
|
CPEP Site Updated and Complete for Fall 2010 |
Friday, December 10th, 2010 |
Friday, December 10th, 2010 |
|
Tuesday, November 30th, 2010 |
|
Tuesday, October 26th, 2010 |
|
Monday, October 11th, 2010 |
|
Tuesday, October 5th, 2010 |
|
Monday, October 4th, 2010 |
|
Monday, September 13th, 2010 |
|
Meeting with Professor Freihaut (Thesis Advisor) |
Monday, September 13th, 2010 |
Friday, September 10th, 2010 |
|
|
|
|
|