Technical assignments |
Crystal Lake Elementary School
Lake Mary, Florida
Leah Matern | Lighting/Electrical | 2010-2011 |
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Leah Matern. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design. |
Senior Thesis Main Page | Penn State | Architectural Engineering | AE Computer Labs | Contact: ltm5014@psu.edu
This page was last updated on 03/29/2011, by Leah Matern and is hosted by the AE Department ©2010 |