"Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Wade Myers. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design."
“This page was last updated on 04/19/2011, by Wade Myers and is hosted by the AE Department © 2010” |
Building E |
Building D |
Building F |
Lab |
Computing |
Glen Burnie High School: Buildings D, E & F |
||
Glen Burnie, MD |
||
Wade Myers |
Mechanical Option |
Senior Thesis 2010 |
Assignment |
Completion Date |
SPRING SEMESTER |
|
Final Checklist Completed |
04/21/2011 |
CPEP Site Completed |
04/21/2011 |
04/12/2011 |
|
04/19/2011 |
|
04/12/2011 |
|
04/12/2011 |
|
04/04/2011 |
|
Final Report Submitted |
04/05/2011 |
03/25/2011 |
|
Post to Discussion Board |
02/11/2011 |
Spring Planning Submitted |
01/18/2011 |
01/14/2011 |
|
FALL SEMESTER |
|
CPEP Site Complete - Fall |
12/10/2010 |
12/10/2010 |
|
11/29/2010 |
|
10/28/2010 |
|
10/13/2010 |
|
10/11/2010 |
|
10/11/2010 |
|
10/06/2010 |
|
10/04/2010 |
|
Thesis Abstract Draft |
09/24/2010 |
09/13/2010 |
|
Resume Submitted |
09/13/2010 |
09/13/2010 |
|
09/10/2010 |
|
Initiation Checklist Part 2 |
09/08/2010 |
Send Letters to Sponsors |
09/03/2010 |
CPEP Full Menu Functionality |
09/03/2010 |
CPEP Homepage Posted |
09/01/2010 |
Career Fair Hosting Sign Up |
08/30/2010 |
Building Statistics Part 1 Draft |
08/27/2010 |
Sent Personal Note |
08/25/2010 |
CPEP Seminar |
08/24/2010 |
Initiation Checklist Part 1 |
08/23/2010 |
Confirmed Master List |
08/23/2010 |
Discussion Board Confirmed |
08/17/2010 |
Obtained Project Documentation |
07/23/2010 |
Owner Permission Received |
07/23/2010 |
The Capstone Project Electronic Portfolio (CPEP) is a web based project and information center. It contains material produced for a year long Senior Thesis class. Its purpose, in addition to providing central storage of individual assignments, is to foster communication and collaboration between student, faculty consultant, course instructors, and industry consultants. This website is dedicated to the research and analysis conducted via guidelines provided by the Department of Architectural Engineering. For an explanation of this capstone design course and its requirements click here.
|
Welcome to Wade Myers’ Senior Thesis Portfolio |
Special Thanks To: · Sam Kulceski, and the rest of the design team at JMT who worked on Glen Burnie High School, for supplying me with the information I needed to successfully complete this project. · AACPS for their permission to use their buildings for my Senior Thesis. · The Penn State AE faculty for all of their help and support throughout my education. |