Name:
The Joint School of Nanoscience and Nanoengineering
Location:

Gateway University Park

2907 E. Lee Street, Greensboro, NC 27401

Website:
Construction Date:
March 2010 - December 2011

 

Back to Home Page  
 
   
 
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the orginal building designs and construction methodologies for this senior thesis project are soley the interpretation of Aubrey Fulton. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.