Derek DiPiazza

Construction Management
Warrenton Aquatics and Recreation Facility
Warrenton, Virginia

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

Welcome to Derek DiPiazza's AE Senior Thesis e-Portfolio

Thesis Proposal

Research

The goal of the proposed research is to identify and develop an ethics training guide that would support a company’s corporate strategy with regard to ethics. With the acquired knowledge, an analysis and implementation tool would be developed for companies to use that will provide them with a solution to increase the ethical performance of their respective company.

Techincal Analysis

Prefabricated Domestic Supply Plumbing

The goal of this analysis is to conclude whether or not a prefabricated ProPress piping system will save money, time, and reduce safety risks compared to the weld pipe currently being constructed.

Fabric Duct System

The goal of this analysis is to conclude whether or not a fabric duct system will save money and reduce installation time as well as supply the desired air to the space. In addition, by analyzing the duct support structure, determine if the members can be resized to reduce cost.

Stuctural Column Redesign

The goal of this analysis is to conclude whether or not structural steel columns compared to the cast in place columns are more advantageous for the building. To conclude this I will compare total cost, schedule durations, lead time, column sizes, and constructability.

To view the final proposal, click here.