Bedford Springs Hotel

Ian Gayman

Construction Management Option
Bedford Springs Hotel
Bedford, PA

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

Welcome to Ian Gayman's AE Senior Thesis e-Portfolio

Technical Assignments

Technical Assignment 1

This assignment highlights the basic elements of the project. The topics discussed are the overall content of the assignment, schedule, cost, building systems, site conditions, client information, staff information, and the project delivery system.

Technical Assignment 2

Coming Soon .

Technical Assignment 3

Within this technical assignment are the initial steps that will be the framework for the thesis research and analyses that will be written in the future. The topics that are discussed in this report are critical industry issues from the fall PACE (The Partnership
for Achieving Construction Excellence) Roundtable, a critical issue research method, a problem identification list, technical analysis methods, and a weight matrix.

Proposal

Coming Soon .

 

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | |
This Page was last updated oJanuary 23, 2007 , By Student Name and is hosted by the AE Department ©2005
<January 23, 2007January 23, 2007