Welcome to Jonathon's AE Senior Thesis e-Portfolio
Progress Log
Date | Announcement |
5.07.07 | CPEP Site Complete |
5.07.07 | Posted ABET Survey and Reflection Page |
5.04.07 | Posted Presentation |
4.12.07 | Posted Final Report |
4.02.07 | Contacted Damion Spar of Reynold Construction |
3.09.07 | Posted Draft Presentation Outline |
2.07.07 | Posted message on Forum |
2.07.07 | Posted Proposal (Revised) |
2.02.07 | Met with Dr. Bahnfleth |
1.28.07 | Researched Potential Equipment at AHR Expo in Dallas |
12.11.06 | Completed Self Evaluation Report |
12.09.06 | Contacted John Weiland of H.F. Lenz Co. |
11.29.06 | Posted Resume |
11.21.06 | Posted Technical Assignment 3 |
10.27.06 | Posted Technical Assignment 2 |
10.06.06 | Posted Abstract |
10.05.06 | Posted Technical Assignment 1 |
10.04.06 | Contacted John Weiland of H.F. Lenz Co. |
10.03.06 | Contacted John Weiland of H.F. Lenz Co. |
10.03.06 | Contacted Carl Irwin of H.F. Lenz Co. |
10.03.06 | Contacted Charles Luttrell of Alpha Associates, Incorporated |
9.20.06 | Posted Bio |
9.17.06 | Posted Building Statistics - Part 1 |
9.13.05 | Posted CPEP website |
9.05.06 | Started 5th year course work |