Technical Assignment 1

Posted October 5th, 2006

Technical Assignment #1 evaluates the Site Logistics Plan, Local Conditions, Client Information, Project Delivery System, Staffing Plan, Project Schedule Summary, Building Systems Summary, and a Project Cost Evaluation. This analysis aims to give the reader backround information about the building, the project team, and some construction issues.

 

TECHNICAL ASSIGNMENT #1
Executive Summary
Construction Project Management
Exisiting Conditions

 

Technical Assignment 2

Posted December 3rd, 2006

Technical Assignment #2 conveys a detailed project schedule, detailed site phasing plans, building skin assembly estimate, detailed structural estimate, and a general conditions estimate. This report's goal is to give the reader an idea of how the project will be built, site logistics issues, and some critical cost items.

 

TECHNICAL ASSIGNMENT #2
Executive Summary
Cost and Methods Analysis

 

Technical Assignment 3

Posted December 3rd, 2006

Technical Assignment #3 summarizes critical industry issues discussed at the P.A.C.E. Roundtable, identifies two research topics, identifies project problems, and methods to analyize those problems. The report also includes a preliminary weight matrix to show how my efforts will be distributed to investigate these issues.

 

TECHNICAL ASSIGNMENT #3
Executive Summary
Alternative Methods and Research

 

 

 

 

 

 

 