This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

Welcome to Michael Funk's AE Senior Thesis e-Portfolio

Technical Assignments

TECHNICAL ASSIGNMENT #1

Construction Project Management
Posted: October 6th, 2006

Executive Summary
Existing Conditions Report
Technical Assignment 1

Technical Assignment #1 and the Existing Conditions Report include the following:
project summary schedule, building systems summary, project cost evaluation,
site plan of existing conditions, local conditions, client information, project delivery system,
and staffing plan. It is intended to familiarize the viewer with the current construction
environment, building makeup, and project constraints.

 

TECHNICAL ASSIGNMENT #2

Cost and Methods Analysis
Posted: October 30th, 2006

Executive Summary
Technical Assignment 2

Technical Assignment #2 includes the following:
a detailed project schedule, site layout plans, an assemblies estimate, a detailed structural systems estimate, and a general conditions estimate. It is intended to give the reader an in-depth view of the construction process, material quantities, and system costs.

 

TECHNICAL ASSIGNMENT #3

Alternative Methods and Research
Posted: November 27th, 2006

Executive Summary
Technical Assignment 3

Technical Assignment #3 includes the following:
critical Industry Issues, critical issues research method, problem identification, and technical analysis methods. This report is intended to give the reader a preview of my research topic and building systems analyses.

 

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | |
This Page was last updated on December 12, 2006 , By Michael Funk and is hosted by the AE Department ©2006