Building Statistics

Building Name:                        Bellefonte Area High School

Location and Site:                                Bellefonte, Pa

Building Occupant Name:                    Bellefonte ISD

Occupancy or Function Types: School/Education

Size:                                                    

Number of Stories above Grade:          2

Primary Project Team: Reynolds Construction
                        Owner:  Bellefonte Area School District                                  
Construction Manager: Reynolds Construction      
                        Architect: Crabtree, Rohrbaugh & Associates                     
                        Civil Engineer:  ELA Group
                        Structural Engineer:      Centerpoint Engineering
                        MEP Engineer: Centerpoint Engineering
                               

Dates of Construction:              Start:   March 2006
                                                            Finish:   Feb 2008 (Estimated)

Project Delivery Method:                      GMP

 

Architectural:               While construction includes a new gym and many new classrooms, there is also many renovations tanking place to the existing structure as well as an entirely new HVAC system and electrical system. The main exterior will be composed of CMU to match the existing structure. Exterior coloring when applicable will be mostly red to cordinate with the school colors.

              