Technical Assignments

Proposal

Description.

Technical Assignment 1

Executive Summary

Technical assignment #1 examines if the air handling units of The Gateway at MICA comply with AHRAE Standard 62.1-2004 ventilation requirements. There are three units in the building serving the first two levels and one on the roof serving studio space on levels 3 -9. After doing the calculations it had been determined that all four units comply with ASHRAE Standar 62.1-2004.

Technical Assignment 2

Executive Summary

Technical Assignment #2 examines the energy use of the building and its compliance with ASHRAE Standard 90.1-2004.

Technical Assignment 3

Executive Summary

Technical Assignment #3 is an indepth look at the mechanical system of The Gateway at MICA.

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | |
This Page was last updated on November 20, 2006 , By Student Name and is hosted by the AE Department ©2005
NOTE:   While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Todd Newswanger. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.