Tyler Swartzwelder

Construction Management
Canton Crossing Tower
Baltimore, Maryland

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

Final Report

Full Final Report

Table of Contents

Abstract
Acknowledgements
Executive Summary
Project Design Overview
Project Team Overview
          Client Information
Project Delivery System
Detailed Project Schedule
Existing Conditions
          Site Vicinity Maps
          Local Conditions

Research Topic - LEED® Guides for Developers
          Problem/Goals
          Research Techniques
          Tools
          Types of Developers
          Project Selection
          Developer Research Findings
          University Comparisons
          Developer Guides
          Conclusion

Technical Analysis 1 – Tower as an Independent System
          Problem/Goals
          Analysis Techniques
          Outcomes
          Comparisons
          Conclusion

Technical Analysis 2 – Cast-In-Place Caissons vs. Precast Piles
          Problem/Goals
          Analysis Techniques
          Column Load Determinations
          Caisson Design Calculations
          Caisson Reinforcement Sizing
          Comparisons
          Conclusion

Appendix
         Project Logistics
                   Site Logistics Plan
Detailed Project Schedule

          Research Topic
                   Individual LEED® Checklist Spreadsheets
                    Penn State vs. Other Universities
                   Developer Guides

          Technical Analysis 1 – Tower as an Independent System
                   Basement Wall Calcs, Section, & EnerCalc Printouts
          Technical Analysis 2 –Caissons vs. Precast Piles
                   Caisson Load Determinations
                   Caisson Depth Analysis