Full Report |
Table of Contents |
|
|
|
Abstract |
Acknowledgements |
Exescutive Summary |
|
|
|
Introduction and Project Background |
|
Project Design Overview |
|
Project Team Overview |
|
Client Information |
|
Project Delivery Method |
|
Existing Conditions |
|
Cost Summary |
|
Project Schedule |
|
Site Utilization Plan |
|
|
|
Research Topic - LEED Guide for Trade Contractors |
|
Introduction |
|
LEED Information Pamphlet |
|
Survey |
|
LEED Guide Examples |
|
Survey Results and Findings |
|
LEED Guide Revisions |
|
Conclusion |
|
|
|
Architectural Breadth - Interior Tenant Fit Out |
|
Introdcution |
|
Space Requirements |
|
Tenant Design |
|
Material List |
|
Conclusion |
|
|
|
Structural Breadth - Impervious Surface Parking vs. Parking Garage |
|
Introduction |
|
Comparision |
|
Site Plan |
|
Architectural Design |
|
Structural Design |
|
Cost |
|
Schedule |
|
Conclusion |
|
|
|
References |
|
|
|
Appendicies |
|
Sequencing Plan |
|
Existing Conditions Site Plan |
|
Detailed Schedule |
|
Site Utilization Plan |
|
Survey Consultant Package |
|
|
Introduction Letter |
|
|
Opinion Survey |
|
|
LEED Information Pamphlet |
|
|
LEED Guide Introduction Letter |
|
|
Submittal - Matrix and List |
|
|
Design Requirements - Matrix and List |
|
|
Construction Waste Management - Matrix and List |
|
Opinion Survey Response |
|
Leed Survey Response |
|
PCI Design Charts |
|
PCAColumn Calculations |
|
|
|