This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

Welcome to Kevin Kaufman's AE Senior Thesis e-Portfolio

Thesis Proposal

Revised Proposal 1.22.07

Complete Proposal

Executive Summary

DEPTH - The mechanical redesign proposes to replace the existing VAV units with a combination DOAS and radiant cooling panel system. Direct-fire absorption chillers will also be compared to electric centrifugal chiller to determine which would be best suited for the chilled water plant.

Proposed Mechanical Depth

BREADTH 1 - The electrical breadth proposes to resize any feeders, branch circuits, over current protection devices, and panel boards due to the change in mechanical equipment requirements.

Proposed Electrical Breadth

BREADTH 2 - The construction breadth proposes to provide a detailed first cost estimate for the VAV and DOAS systems as well as the two chiller options. This will help put into perspective which system is overall the most attractive without ignoring first costs and schedule implications.

Proposed Construction Breadth

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | |