Front

Rodrick A Crousey

Mechanical
George W. Hays PK-12 Public School
Cincinnati, OH

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

 

Technical Assignments

Building Proposal

Proposal Executive Summary

This is a proposal for the addition of ice storage and chilled beams for the George W. Hays PK-12 Public School in Cincinnati, OH.

 

ASHRAE 62.1 Ventilation Compliance Evaluation

Ventilation Compliance Executive Summary

This report looks at the ventilation requirements of this building with respect to ASHRAE Standard 62.1.

 

Energy Analysis

Energy Analysis Executive Summary

This report looks at the energy consumption and costs of the building while comparing it to national standards such as ASHRAE Standard 90.1

 

Mechanical Systems Evaluation

Evaluation Executive Summary

This report analyzes the effectiveness of the various building mechanical systems Mechanical Systems in comparison with initial design goals.

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | |
This Page was last updated on May 5, 2007 , By Student Name and is hosted by the AE Department ©2005