Welcome to STUDENT's AE Senior Thesis e-Portfolio
Technical Assignments
Proposal
This report is an overview and evaluation of the existing lighting conditions.
This report is an overview and evaluation of the existing electrical and telecom systems.
Lamp Data ...... Ballast Data ...... Equipment Schedule ...... XFMR Schedule ...... Feeder Schedule
Utility 1 - Real Energy Use 208...... Utility 2 - Real Energy Use 480 ......Utility 3 - Average Current Draw
Feeder Calcs ...... Switchboard Calcs
This report is comprised of the powerpoint that was presented to Lutron.
Comments from the Lighting Designers presented to at Lutron
This report is comprised of the preliminary lighting design of two of the fieldhouse spaces.