3D Coordination
For Current Information about BIM Project Execution Planning is currently at
http://bim.psu.edu/Uses/default.aspx
Description:
A process in which Clash Detection software is utilized during the coordination process to determine field conflicts by comparing 3D models of building systems. The goal of clash detection is to eliminate the major system conflicts prior to installation.
Potential Value:
- Coordinate building project through a model
- Reduce and eliminate field conflicts; which reduces RFI's significantly compared to other methods
- Visualize construction
- Increase productivity
- Reduced construction cost; less cost growth due to design coordination (i.e. change orders)
- Decrease construction time
- Increase productivity on site
- Prefabricate off-site leading to a safer and cleaner
- More accurate as built drawings
- Increase marketability
Resources Required:
- 3D Model manipulation
- Model Review application
Team Competencies Required:
- Ability to deal with people and project challenges
- Ability to manipulate, navigate, and review 3D
- Knowledge of BIM model applications for facility updates
- Knowledge of building systems.
Selected References:
- Staub-French S and Khanzode A (2007) **3D and 4D Modeling for design and construction coordination: issues and lessons learned** ITcon Vol. 12, pg. 381-407, http://www.itcon.org/2007/26
- Khanzode A, Fischer M, Reed D (2008) **Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project**, ITcon Vol. 13, Special Issue Case studies of BIM use , pg. 324-342, http://www.itcon.org/2008/22
- AECbytes.com - venderhub
|
|