The Village at Shirlington
A case study analysis was performed on the Village at Shirlington construction project in Shirlington, VA. For this case study, 3D and 4D CAD model were developed to analyze the schedule for the project. The goal of the modeling efforts was to determine if opportunities for optimizing the schedule could be identified through the display of the 4D CAD model in the Immersive Construction Lab. After the models were developed, the project team, including the developer and contractor performed a detailed review within the ICon Lab. During this schedule analysis, they identified opportunities for accellerating the schedule and refining the schedule sequence.
We wish to thank Trammell Crow Company and Harvey-Cleary for their participation and support of this industry case study.