Welcome to Blake Herrschaft's AE Senior Thesis e-Portfolio
Thesis Abstract
Executive Summary:
Primary Project Team
Owner: ZOM Development
Architect: Graham Gund Architects
General Contractor: Hardin Construction
MEP Engineers: GRG Inc.
Structural Engineers: HWA
Electrical: Encompass Electrical Technologies
Architecture
-23 Stories
-230 Luxury condominiums
-450 Car parking garage
-Distinctive "Wave" design
-Outdoor sundeck and spa
Mechanical
-Heat pump units for each apartment
-3 Rooftop air handling units
-100% Outdoor air supply
-A two-cell fluid cooler
-One atmospheric boiler
-Sovent sanitation system
Structural
-Cast-in-place concrete columns
-27-foot bay spacings provide large, column free spaces
-2-way, flat-plate, post-tensioned slabs
Lighting / Electrical
-Compact flourescent dowlights and wallwash for common areas
-2 main distribuition panels
-48,358 Amps feeding 120/208 volt panel
-35,798 Amps feeding 277/480 Volt panel
Construction
-Duration: 740 Days
-Cost: $38 Million
-Subcontractors: 93 total