Blake R. Herrschaft

Mechanical Option
The Waverly on Lake Eola
Orlando, FL

This is a student-generated Capstone Project e-Portfolio (CPEP) produced in conjunction with the AE Senior Thesis e-Studio.

Welcome to Blake Herrschaft's AE Senior Thesis e-Portfolio

Thesis Abstract

Executive Summary:

Primary Project Team

Owner: ZOM Development
Architect: Graham Gund Architects
General Contractor: Hardin Construction
MEP Engineers: GRG Inc.
Structural Engineers: HWA
Electrical: Encompass Electrical Technologies

Architecture

-23 Stories
-230 Luxury condominiums
-450 Car parking garage
-Distinctive "Wave" design
-Outdoor sundeck and spa

Mechanical

-Heat pump units for each apartment
-3 Rooftop air handling units
-100% Outdoor air supply
-A two-cell fluid cooler
-One atmospheric boiler
-Sovent sanitation system

Structural

-Cast-in-place concrete columns
-27-foot bay spacings provide large, column free spaces
-2-way, flat-plate, post-tensioned slabs

Lighting / Electrical

-Compact flourescent dowlights and wallwash for common areas
-2 main distribuition panels
-48,358 Amps feeding 120/208 volt panel
-35,798 Amps feeding 277/480 Volt panel

Construction

-Duration: 740 Days
-Cost: $38 Million
-Subcontractors: 93 total

 

Senior Thesis | The Pennsylvania State University | Architectural Engineering | AE Lab | |
This Page was last updated on October 26, 2005 , By Student Name and is hosted by the AE Department ©2005