Technical Assignments
Technical Assignment 1
Posted: October 4th, 2005
Executive
Summary
Exising
Conditions Report
Technical
Assignment #1 Report
Technical Assignment #1 along with Existing Conditions Report includes the
following:
project summary schedule, building systems summary, project cost evaluation,
site plan of existing conditions, local conditions, client information, project
delivery system,
and staffing plan. It is intended to familiarize the reader with the current
construction
environment, building makeup, and project constraints.
Technical Assignment 2
Posted: October 31st, 2005
Executive
Summary
Technical
Assignment #2 Report
Technical Assignment #2 includes the following:
a detailed project schedule, site layout plans, an assemblies estimate, a
detailed
structural systems estimate, and a general conditions estimate. It
is intended to
give the reader an indepth view of the construction process,
material quantities,
and system costs for the Columbia Heights Community Center.
Technical Assignment 3
Posted: November 21st, 2005
Executive
Summary
Technical
Assignment #3 Report
Technical Assignment #3 includes the following:
critical Industry Issues, critical issues research method, problem identification,
and technical analysis methods. This report is intended to give the reader
a preview of my research topic and building systems analyses.