Technical Assignment 1

Technical Assignment 1 contains an existing lighting conditions report for the four spaces to be redesigned within the Natty Boh Building in Baltimore, Maryland. I also detailed what I believed the spaces design criteria and ran a lighting simulation to evaluate how they performed.

Executive Summary

Full Report (pdf)



Technical Assignment 2

Technical Assignment 2 is a detailed report of the existing electrical conditions of the Natty Boh building. Contained within is a complete electrical equipment schedule, major mechanical and lighting equipment schedules, panel schedules with load calculations, and an electrical riser diagram.

Executive Summary

Full Report (pdf)

Panel Boards w/ Calcs (xls)



Technical Assignment 3

Technical Assignment 3 is a powerpoint presentation outlining my lighting redesign proposal for the spaces outlined in technical assignment 1.

Full Report (ppt)

Full Report - revision for Lutron(ppt)

Lutron Comments (doc)