Date | Announcement |
4.16.07 | Presented Thesis to Faculty |
4.12.07 | Final Report Completed |
3.24.07 | Contact Jeff Styles of Styles Engineering |
2.16.07 | Advisory meeting with Professor Parfitt |
2.15.07 | Advisory meeting with Dr. Boothby |
2.15.07 | Advisory meeting with Dr. Lepage |
2.12.07 | Advisory meeting with Dr. Lepage |
2.7.07 | Updated Thesis Proposal posted |
2.6.07 | Alternative elevator core layouts investigated |
2.05.07 | Advisory meeting with Dr. Lepage |
12.15.06 | Thesis Proposal Posted |
11.21.06 | Technical Assignment 3 Posted |
11.21.06 | Consulted advisor, Dr. Boothby regarding Tech Assn 3. |
11.10.06 | Recieved shear wall lecture material from advisor, Dr. Boothby |
10.27.06 | Technical Assignment 2 Posted |
10.20.06 | Consulted advisor, Dr. Boothby regarding Tech Assn 2. |
10.11.06 | Thesis Abstract Posted. |
10.5.06 | Technical Assignment 1 Posted. |
9.28.06 | Email correspondence with project architect, Michael Kaufman. |
9.25.06 | Abstract Assignment. |
9.20.06 | Bio-Sketch Assignment. |
9.20.06 |
Posted Building Statistics 1 Assignment. |
9.19.06 | Email correspondence with MEP engineer, Dan Spiewak. |
9.19.06 | Email correspondence with Structural engineer, Don Hamlin. Refered to Jose Medero. |
9.18.06 | Email correspondence with project architect, Michael Kaufman. |
9.18.06 | Main CPEP Page Due. |
9.18.06 | Email correspondence with consulting architect, Dan Harding. |
9.5.06 | Owner permission received from project owner, Bert Crandell. |
8.31.06 | Email correspondence with project owner, Bert Crandell. |