Final Report
The final report explaining the results found on the overall redesign project, Building Systems Integration, for the Milton Hershey School New Supply Center is located below.
Full Report Building Systems Integration - pdf (14 MB)
Mechanical Systems Existing Conditions
DOAS with Water Source Heat Pumps Analysis
Chiller-heater and Heat Recovery System Analysis
Mechanical System Redesign Conclusions
Structural/Construction Breadth
Conclusions and Recommendations
Appendix A - ASHRAE Standard 62.1 Ventilation Calculations
Appendix B - Cost Analysis Spreadsheet
Appendix C - Electrical Panel Adjustments