Date | Announcement |
5.6.07 | Posted Reflection and ABET Outcome Survey |
4.26.07 | Posted Final Thesis Presentation and Reflection |
4.18.07 | Presented Senior Thesis Presentation |
4.13.07 | Posted Final Report |
4.6.07 | Discussed Dimming Systems with Aram Ebben, Lighting Designer in the Industry |
4.5.07 | Met with Professor Ling to Discuss Acoustical Breadth |
4.5.07 | Met with Professor Freihaut for a Final Discussion of Mechancial Breadth |
3.29.07 | Posted Updated Proposal |
3.23.07 | Discussed Proposed Lighting Design with Andrea Hartranft, Lighting Designer in the Industry |
3.22.07 | Discussed Mechanical Breadth Study with Professor Freihaut |
3.21.07 | Recieved Comments from Dr. Mistrick on Mid-Semester Submission |
3.8.07 | Posted Presentation Outline |
3.7.07 | Discussed CFL Comparison Breadth with Aram Ebben, Lighting Designer in the Industry |
2.27.07 | Posted Mid-Semester Submission |
2.26.07 | Met with Professor Dannerth to Discuss Mid-Semester Submission |
2.22.07 - 22.24.07 | IES Trip to Philadelphia |
2.13.07 | Posted Question on Discussion Board Regarding LED Track |
2.11.07 | Scheduled Meeting with Professor Dannerth |
2.7.07 | Posted Question on Discussion Board About CFL Comparison |
2.6.07 | Posted Updated Thesis Proposal |
1.10.07 | Discussed CFL Comparison Breadth with Andrea Hartranft, Lighting Designer in the Industry |
12.19.06 | Posted Thesis Proposal |
12.18.06 | Posted Comments from Lutron |
12.15.06 | Presented Technical Report 3 at Lutron |
12.14.06 | Updated Technical Report 3 Presentation per meeting with Dr. Mistrick |
12.13.06 | Posted Building Statistics Part 2 |
12.12.06 | Met with Professor Dannerth to discuss electrical part of proposal |
12.7.06 | Met with Dr. Mistrick to discuss Technical Report 3 Presentation |
11.28.06 | Met with Professor Dannerth to discuss Technical Report 2 |
11.27.06 | Posted Technical Report 3 |
11.13.06 | Visual Research for Techinical Report 3 |
11.12.06 | Research for Technical Report 3- Studying LEDs |
11.8.06 | Research for Technical Report 3- Studying Office Lighting |
11.7.06 | Posted Technical Report 2 |
10.9.06 | Posted Thesis Abstract |
10.2.06 | Updated Bio Sketch and Resume |
10.4.06 | Posted Technical Report 1 |
9.25.06 | Abstract Due |
9.20.06 | Posted Building Statistics Part 1 |
9.15.06 | Lighting Analysis Memo due |
9.14.06 | Spoke with Architect about the project |
9.12.06 | Spoke with General Contractor about the project |
9.8.06 |
Building Statistics Part 1 Turned In |
9.1.06 | Spoke with Lighting Designer about Woolly Mammoth |
8.30.06 | Recieved building drawings |
8.26.06 | Recieved owner permission to use building as my thesis model |