Welcome to Kate's AE Senior Thesis e-Portfolio
Progress Log
| Date | Announcement |
| 5.6.07 | Posted Reflection and ABET Outcome Survey |
| 4.26.07 | Posted Final Thesis Presentation and Reflection |
| 4.18.07 | Presented Senior Thesis Presentation |
| 4.13.07 | Posted Final Report |
| 4.6.07 | Discussed Dimming Systems with Aram Ebben, Lighting Designer in the Industry |
| 4.5.07 | Met with Professor Ling to Discuss Acoustical Breadth |
| 4.5.07 | Met with Professor Freihaut for a Final Discussion of Mechancial Breadth |
| 3.29.07 | Posted Updated Proposal |
| 3.23.07 | Discussed Proposed Lighting Design with Andrea Hartranft, Lighting Designer in the Industry |
| 3.22.07 | Discussed Mechanical Breadth Study with Professor Freihaut |
| 3.21.07 | Recieved Comments from Dr. Mistrick on Mid-Semester Submission |
| 3.8.07 | Posted Presentation Outline |
| 3.7.07 | Discussed CFL Comparison Breadth with Aram Ebben, Lighting Designer in the Industry |
| 2.27.07 | Posted Mid-Semester Submission |
| 2.26.07 | Met with Professor Dannerth to Discuss Mid-Semester Submission |
| 2.22.07 - 22.24.07 | IES Trip to Philadelphia |
| 2.13.07 | Posted Question on Discussion Board Regarding LED Track |
| 2.11.07 | Scheduled Meeting with Professor Dannerth |
| 2.7.07 | Posted Question on Discussion Board About CFL Comparison |
| 2.6.07 | Posted Updated Thesis Proposal |
| 1.10.07 | Discussed CFL Comparison Breadth with Andrea Hartranft, Lighting Designer in the Industry |
| 12.19.06 | Posted Thesis Proposal |
| 12.18.06 | Posted Comments from Lutron |
| 12.15.06 | Presented Technical Report 3 at Lutron |
| 12.14.06 | Updated Technical Report 3 Presentation per meeting with Dr. Mistrick |
| 12.13.06 | Posted Building Statistics Part 2 |
| 12.12.06 | Met with Professor Dannerth to discuss electrical part of proposal |
| 12.7.06 | Met with Dr. Mistrick to discuss Technical Report 3 Presentation |
| 11.28.06 | Met with Professor Dannerth to discuss Technical Report 2 |
| 11.27.06 | Posted Technical Report 3 |
| 11.13.06 | Visual Research for Techinical Report 3 |
| 11.12.06 | Research for Technical Report 3- Studying LEDs |
| 11.8.06 | Research for Technical Report 3- Studying Office Lighting |
| 11.7.06 | Posted Technical Report 2 |
| 10.9.06 | Posted Thesis Abstract |
| 10.2.06 | Updated Bio Sketch and Resume |
| 10.4.06 | Posted Technical Report 1 |
| 9.25.06 | Abstract Due |
| 9.20.06 | Posted Building Statistics Part 1 |
| 9.15.06 | Lighting Analysis Memo due |
| 9.14.06 | Spoke with Architect about the project |
| 9.12.06 | Spoke with General Contractor about the project |
9.8.06 |
Building Statistics Part 1 Turned In |
| 9.1.06 | Spoke with Lighting Designer about Woolly Mammoth |
| 8.30.06 | Recieved building drawings |
| 8.26.06 | Recieved owner permission to use building as my thesis model |