Progress Log
Date |
Announcement |
| 05.04.07 | CPEP completed and ready for evaluation. |
| 05.02.07 | Posted ABET Evaluation and Reflection. |
| 04.30.07 | Submitted Honors Thesis to Schreyer Honors College, rang gong. |
| 04.18.07 | Presented Thesis Powerpoint to Mechanical Faculty Jury. |
| 04.12.07 | Posted Final Report |
| 04.11.07 | Presented Thesis Abstract Poster at Central PA ASHRAE Student Night. |
| 04.01.07 | Posted revised Thesis Proposal |
| 03.29.07 | Met with Dr. Burroughs to review work on acoustics analysis. |
| 03.19.07 | Posted Thesis Presentation Outline . |
| 02.28.07 | Updated biography and resume with future career plans. |
| 02.07.06 | Met with Dr. Borroughs to discuss acoustics breadth work on thesis. |
| 02.06.07 | Contacted IES Vendor for student package, HAP Seminar leader to attend seminar. |
| 02.05.06 | Met with Dr. Freihaut (previous thesis advisor) and Dr. Srebric (current thesis advisor) to discuss direction of this thesis. Posted first discussion board question. |
| 1.27.07-01.30.07 | Attended ASHRAE Winter Meeting and AHR Expo. |
12.15.06 |
|
| 12.11.06 | Consulted proposal ideas with Primary MEP Engineer. |
| 12.04.06 | |
| 10.30.06 | |
10.06.06 |
|
10.05.06 |
|
09.30.06 |
|
09.19.06 |
|
08.17.06 |
Owner approval recieved. |