Washington Christian Academy Flagship & Gymnasium Olney, MD |
||||||||||||||||
Casey Mowery Construction Management Option |
||||||||||||||||
User Note:Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Casey Mowery. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design. |
Washington Christian Academy Abstract Please click on the picture below to see a one page abstract on the Washington Christian Academy project. The abstract highlights the architecture, the construction methods, the involved parties, and the structural, mechanical, and electrical systems.
|
|
||||||||||||||
This page was last updated on 10/2/2007 by Casey Mowery and is hosted by the AE Department © 2008 |