|
|
|||||||||||||||||
Washington, D.C. |
||||||||||||||||||
|
||||||||||||||||||
|
Welome to Ryan's AE SeniorThesis e-portfolio Technical Assignments
Technical Report 1 Techincal Report 1 is an existing lighting conditions report for the Newseum and Freedom Forum Headquarters. Four main spaces were studied. They are the News History Gallery, Freedom Forum offices, welcoming lobby, and the Newseum outdoor entry area. Design criteria was also established for each space.
Technical Report 2 Technical Report 2 is a description of the existing electrical system for the Newseum and Freedom Forum Headquarters. The service entrance, voltage systems, and protective devices are described. Switchgear, lighting loads, and mechanical loads are also given in table form. Calculations for the service entrance size are also provided. There is also a single line diagram for each of the buildings three services included in the report.
Technical Report 3 Technical Report 3 is a schematic lighting design for four spaces in the Newseum and Freedom Forum Headquarters. The four spaces are the News History Gallery, Freedom Forum offices, Welcoming Lobby, and the exterior porch entry. Design criteria and goals are given along with images to help convey ideas. Technical Report #3 (power point) Comments from Lutron presentation
|
|||||||||||||||||
Senior Thesis Page / Penn State University / Architectural Engineering / AE Computer Labs / Contact Ryan This page was last updated on1/23/08, by Ryan Wise and is hosted by the AE Department ©2008 |