The following report is a culmination of the past year's research and analysis of Best Buy Corporate Building D. The goal of this semester was to redesgin the corporate building as a concrete structure, employing a post-tension slab and beams. Research into the cost and architecture of the new structure was also conducted.

Final Executive Summary Only

Final Report

ADAPT-PT Slab Output

ADAPT-PT 2-Span Beam Output

ADAPT-PT 3-Span Beam Output