Army National Guard Readiness Center
Arlington, Virginia
Amanda C. Farace
Structural Option
AE Senior Thesis 2009 I 2010
 

Presentation

This presentation is a summary of the process, goals, and conclusions of this year long analysis and redesign of the Army National Guard Readiness Center. It was presented on April 13th, 2010 before a jury consistening of faculty from the Architectural Engineering Department at The Pennsylvania State University

 

A pdf version of this report may be viewed here.

A ppt version of this report may be viewed here.

 

User Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Amanda Farace. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.
This page was last updated on April 12, 2010, by Amanda Farace and is hosted by The Pennsylvania State University AE Department ©2009