DATE POSTED
04.23.2011:
04.19.2011:
04.19.2011:
04.19.2011:
04.07.2011:
04.06.2011:
03.25.2011:
03.22.2011:
02.19.2011:
02.18.2011:
02.16.2011:
02.11.2011:
02.04.2011:
01.21.2011:
12.07.2010:
12.07.2010:
11.11.2010:
10.27.2010:
10.04.2010:
09.13.2010:
09.10.2010:
09.08.2010:
09.08.2010:
08.28.2010:
08.27.2010:
08.27.2010:
08.26.2010:
08.26.2010:
08.25.2010:
08.23.2010:
08.23.2010:
PROGRESS ITEM
CPEP Site Ready for Final Review
ABET Assessment Chart and Reflection Posted
Final Presentation (PP &.PDF) Posted
Presentation/Thesis Defense Completed
Final
Report - [+] Posted
Final Report Bound and Submitted
Presentation Outline with Draft and Sample Slides
Reposted Revised
Proposal - [+]
"Go/No-Go" presentation follow-up Meeting
Building Stimulus gives "Go/No-Go" Presentation
Turned in Electrical Progress Report #1.
Turned in Lighting Progress Report #1.
Posted question -
[+]
on E-Studio Discussion Board.
Posted
Building Stimulus Proposal - [+]
Posted
Lighting Tech 3 Presentation - [+]
Re-posted corrected Electrical
Tech 2 Report - [+]
Posted Electrical
Tech 2 Report - [+]
Posted Lighting
Tech 1 Report - [+]
Posted Resumé to Y: Drive for Career Fair
Building Stats - [+] Posted on Team CPEP
Posted
"Lighting Proposal" Report - [+]
Resume Submitted for AE Career Fair Listing
Turned in Project Initiation Form 2
Turned In Project Initiation Form 1
Building Stats I Paper Draft
Signed up to Host Mueller Associates for The AE Career Fair
CPEP Home Page Draft -
[+]
Bio Sketch Posted -
[+]
Attended Dreamwaver Seminar
Obtained Project Documentation
Confirmed Master List Information