Freetown Elementary School Glen Burnie, MD Matthew Buda Mechanical Option |
![]() |
---|
Final Report |
||
The following report focuses on the proposal for alternative mechanical systems for Freetown Elementary School as well as a look into two breadth topics. Information has been compiled throughout the year including information from Tech Reports 1, 2, and 3 from the fall semester.
|
|
Other |
Note: While great efforts have been taken to provide accurate and complete information on the
pages of CPEP, please be aware that the information contained herewith is considered a work‐inprogress
for this thesis project. Modifications and changes related to the original building designs and
construction methodologies for this senior thesis project are solely the interpretation of Matthew Buda. Changes and discrepancies in no way imply that the original design contained errors or was
flawed. Differing assumptions, code references, requirements, and methodologies have been
incorporated into this thesis project; therefore, investigation results may vary from the original
design. |
This page was last updated on October 11, 2010, by Matthew Buda and is hosted by the AE Department © 2010. |