Final Report
The following report is a summary of the work conducted for AE 482/897G during the Spring 2011 Semester.
Executive Summary
|
Final Report --
Full Report
PDF |
|
Final Report --
No Appendix
PDF |
|
Final Report --
Appendix Only
PDF |
All calculation files can be found at Y:\Pmorgan.
|
|
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a workâin progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Patrick Morgan. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.
|
|