Technical Assignments
Technical Assignment 1
Project Summary Schedule, Building Systems Summary, Project Cost Evaluation, Site Layout Planning, Existing Conditions, Local Conditions, Client Information, Project Delivery Systems and Staffing Plan
Click Image for Technical Report 1
Technical Assignment 2

Detailed Project Schedule, Detailed Structural System Estimate, General Conditions Estimate, BIM Use Evaluation, Constructability Issues
Click Image for Technical Report 2
Technical Assignment 3

LEED Evaluation, Schedule Acceleration Scenarios, Value Engineering Topics, Critical Industry Issues
Click Image for Technical Report 3
User Note:
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP,
please be aware that the information contained herewith is considered a work-in-progress for this thesis project.
Modifications and changes related to the original building designs and construction methodologies for this
senior thesis project are solely the interpretation of Brandon Tezak. Changes and discrepancies in no way
imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements,
and methodologies have been incorporated into this thesis project; therefore, investigation results may
vary from the original design.