abc
 
 
Final Report

To the right is my thesis report. It details four construction analyses with two construction related breadths (structural and architectural). This project includes information gathered from the Pegula Ice Arena project team, past technical reports and industry contacts.

The first analysis details a solution in sequencing the community rink off the critical path. With this analysis came a structural breadth. The second analysis details different sequencing options the project team could have looked into. The third analysis explores a new facade system that could have been utilized as part of this project. With this analysis came an architectural breadth. Finally, research into different subsurface exploration methods was analyzed as part of the fourth analysis.

Enjoy!

 
 
 
“Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐inprogress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Shane Marshall. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.”
“This page was last updated on October 22nd, 2012, by Shane Marshall and is hosted by the AE Department©2012”