Cameron Mikkelson Construction Management Silverado Senior Living 1105 Davidson Road Brookfield, WI 53045 |
|||||||||||||||||||
![]() |
|||||||||||||||||||
![]() |
|||||||||||||||||||
![]() |
|||||||||||||||||||
![]() |
|||||||||||||||||||
|
![]() |
Total Time: 12 – 14 Minutes Total Slides: 30 - 34 Title Slide: 30 sec Project Overview: 1 min Analysis Topics/Overview: 30 sec Analysis 1 (Prefabrication of Plumbing Rough-In with Interior wall panels.) – 3 min Analysis 2 (Installation of Solar Panels and Structural/Electrical Breadths) – 3 min Analysis 3 (Schedule Acceleration through SIPS) – 3 min Analysis 4 – Resequencing of Project Schedule – 2 min Title Slide - 1 Slide Conclusion and acknowledgements – 1 min *I will mention both breadths but only presenting electrcal
|
![]() |
News and Updates
|
|||||||||||||||
Note: While great efforts have been taken to provide accurate and completeinformation on the pages CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Ian Bower. Changes and discrepancies in no way imply that the original design contained errors or was flawed. differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design. This page was last updated on 5/5/2014, by Cameron Mikkelson and is hosted by the AE Department ©2013 |
Links Senior Thesis Main Page Penn State Architectural Engineering Department AE Computer Labs Contact Me |