main facade

The Environmental Studies Lab

East Coast, USA

Codi Shine

Construction Option

     

Technical Assignment 1

The first report for my thesis shows some of the existing conditions and scope of work that the building is currently under.  Technical assignment 1 consists of a schedule summary, a building systems summary, a cost evaluation, existing conditions site plan, client information, the project delivery system and the staffing plan.  This report was delivered as a slide show.

 
     

Technical Assignment 2

In the second technical assignment, I analyzed some key features of the building.  This deliverable consists of a detailed project schedule, a detailed structural estimate and an assemblies MEP estimate, a three phase site plan, a general conditions estimate, constructability challenges, and a building information modeling evaluation.

 
     

Technical Assignment 3

This technical assignment is intended to identify problems and possible solutions. The deliverable for this assignment consists of schedule acceleration scenarios, value engineering topics and critical industry issues.

There is a second part to this assignment. The second part identifies possible analyses for my proposal.

 
 

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Codi Shine. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design