Memorial Vista

Undisclosed Future Client

Northern Virginia

 

 

William Gamble - Construction Option

 

Image courtesy of Gensler

Home Student Bio Building Stats Tech Assignments Abstract Proposal Final Report Final Presentation Reflection

 

 

Final Presentation


Click the images to the right to view the final presentation.

 

Over the course of the 2013 and 2014 academic year, Memorial Vista was analyzed to identify areas in which alternative solutions in either construction or design would enhance the project's goal of shortening the schedule. These analyses can be quickly summarized through the visuals seen in the slideshow shown to the right.

 

 

 

 

 

 

 

PowerPoint

 

PDF

 

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐ progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of William Gamble. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

 

Senior Thesis Website Penn State PSU AE Department AE Computer Labs Contact Me

 

This page was last updated on 04/16/2014 by William Gamble and is hosted by the AE Department ©2014