SSM - St. Clare Health Center
Christopher Brandmeier
St. Louis County: Fenton, Missouri
Structural Option
         
Home
Student Biography
Building Statistics
Thesis Abstract
Technical Assignments
Thesis Proposal
Final Report
Presentation
Reflection
e-Studio Home
News Feed
  Sept. 3, 2014 CPEP Created  
  Sept. 12, 2014 Technical I  
  Sept. 18, 2014 Building Stats  
  Sept. 18, 2014 Student Bio  
  Sept. 26, 2014 Technical II  
  Oct. 17, 2014 Technical III  
  Nov. 17, 2014 Technical IV  
  Dec. 12, 2014 Proposal  
  April 13, 2015 Final Report  
  April 13, 2015 Presentation  
  May 4, 2015 CPEP Complete  
       
       
       
       
       
       
 
     
 

Thesis Presentation

 
  ____________________________________________________________  
 
The following powerpoint is a version of that given in defense of this thesis before a jury of structural faculty and peers. The presentation occured on April 13, 2015 in 302 Engineering Unit B.
 
   
 
FULL POWERPOINT (PDF)
 
 
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Christopher Brandmeier. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.
 
 
 
   
 
 
 
This page was last updated on September 7, 2014 by Christopher Brandmeier and is hosted by the AE Department ©2014